Saturday, 1 June 2013

Course Reflection


This course has been very enriching and enjoyable. It has tremendously contributed to my growth as a student. Every activity and assignment in this course was a unique learning opportunity.

 

 I have learned how to write a proper CV and how to convince the reader that I can do the job, then was the letter where I had no idea about it at the beginning when I wanted to apply for a job but after the course I realize how important the letter is to the HR department to know more about me, after that, we did a meeting without knowing what is the topic and I think it was really great because we had ten minutes to organize the meeting and I was a member in the meeting where I knew that every member should participate to make it interesting and enjoyable.

 

After performing the meeting we did a presentation, it was a very effective practice for the future. I have learned how to present in a systematic way so that the audience gets what I want to say and how to acquire their attention by using a variety drive, beside that I got the better off faithfully,  one of my enormous challenges which was presenting in front of an audience.

 

In the future this course will help me a lot due to the nature of my major which includes presenting many projects and preparing meetings and I will try to outdo the best, I want to thank Mr. Gregory for his kindness that he helped not only me but most of the students to do things in a right way.

(262 Words)

Proposal


ADMC
Proposal
Emirates Nuclear Energy Corporation
 
Khaled Ali Mohammed Shuaib(H00214376) Abdulla Al Rumaithi(H00155900)  CLX
5/2/2013

 


 

 

Instructor: John Vrhovnik

 




Overview

This essay focusses on Emirates Nuclear Energy Corporation in Abu Dhabi. The corporations’ history, in terms of its past, present and future and why it was set up will be discussed. Within this, the corporation’s mandate as well as its milestones will be examined. A table will be used to summarize the corporation’s projections on the future power generation. The mission statement for the company will be discussed, ENEC has faced a lot of problem at the beginning for instance: Getting an approval to set a nuclear reactor in the UAE, the reactions of neighboring countries and how did the UAE overshoot the problems. The possible solutions that the UAE faced will be explained. What makes the UAE very interested in the clean energy sector and why it is the first country to decide among the GCC countries? A conclusion will aim to summarize the importance of the corporation to the nation.


 

 

 

 

 

 

 

                                I.            Introduction

·         A description of ENEC

·         A brief history of ENEC

·         An overview of the scope of the report

·         The reason why I choose this company

            

            

                              II.            Body 1

·         The development of ENEC

·         From the beginning to the present – what did ENEC accomplish?

 

                            III.            Body 2

·         The reasons of the UAE to get a clean energy

·         The prime contractor

 

    

                           IV.            Body 3

·         Neighboring countries risk

·         The organizations (FANR)

 

                             V.            Body 4

·         The head quarter management

·         Who will oversee the nuclear program

 

 

 

 

 

                           VI.            Conclusion

·          The current vision and situation of ENEC

·         My opinion about the future challenges of ENEC

·         The bright future of ENEC

 

 

           

 

 

 

 

 

 

Resources

 

 

 

 

      Ameinfo.com (2013 January 29). Emirates Nuclear Energy Corporation seeks   Emirati talent at Tawdheef. Retrieved from    http://www.ameinfo.com/emirates-          nuclear-energy-corporation-seeks-  emirati-327580

      Emirates Nuclear Energy Corporation (2013): Powering the future of the UAE             through safe, clean and efficient nuclear energy. Retrieved from          http://www.enec.gov.ae/

      World Nuclear Association (2013 April).Nuclear Power in the United Arab                     Emirates. Retrieved from http://www.world-nuclear.org/info/Country-   Profiles/Countries-T-Z/United-Arab-Emirates/#.UXkVwMqlqWo

      World Nuclear News (2013, March 25). Barakah Containment Liner Assembly             Starts. Retrieved from http://www.world-nuclear-news.org/NN-    Barakah_containment_liner_assembly_starts-2503134.html

      YouTube (Apr 11, 2012) UAE Peaceful Civil Nuclear Energy Program (English    version). Retrieved from             http://www.youtube.com/watch?list=UU3sNeStECi8l2ontCOxKGIg&feature=            player_detailpage&v=RBbIbGdKapg,